Chung-Wei Feng

Associate Professor

  • 885 Citations
  • 10 h-Index
19952019

Research output per year

If you made any changes in Pure these will be visible here soon.

Research Output

  • 885 Citations
  • 10 h-Index
  • 16 Article
  • 9 Conference contribution
  • 9 Paper
Filter
Article
2019

應用擴增實境及建築資訊模型於機電設施維護作業之空間分析

Translated title of the contribution: Applying AR and BIM in the Spatial Analysis of Maintenance Work of Eletromechanical FacilitiesFeng, C. W., Chen, Y. J. & Huang, S. H., 2019 Apr 1, In : Journal of the Chinese Institute of Civil and Hydraulic Engineering. 31, 2, p. 163-172 10 p.

Research output: Contribution to journalArticle

2016
5 Citations (Scopus)
2015
1 Citation (Scopus)
2014

Internetinės prieigos tilto išplovimo stebėjimo realiuoju laiku sistema stichinėms nelaimėms valdyti

Translated title of the contribution: Web-based real time bridge scour monitoring system for disaster managementSkibniewski, M., Tserng, H. P., Ju, S. H., Feng, C. W., Lin, C. T., Han, J. Y., Weng, K. W. & Hsu, S. C., 2014 Jan, In : Baltic Journal of Road and Bridge Engineering. 9, 1, p. 17-25 9 p.

Research output: Contribution to journalArticle

4 Citations (Scopus)
2011

Using bim model and genetic algorithms to optimize the crew assignment for construction project planning

Chen, Y. J., Feng, C-W., Wang, Y. R. & Wu, H. M., 2011 Jul 1, In : International Journal of Technology. 2, 3, p. 179-188 10 p.

Research output: Contribution to journalArticle

8 Citations (Scopus)
2010

Clarifying the relationship between quality of global positioning system data and precision of positioning

Yeh, T. K., Chen, Y. J., Chung, Y. D., Feng, C. W. & Xu, G., 2010 Feb 1, In : Journal of Surveying Engineering. 136, 1, p. 41-45 5 p., 002001QSU.

Research output: Contribution to journalArticle

3 Citations (Scopus)

Using the MD CAD model to develop the time-cost integrated schedule for construction projects

Feng, C. W., Chen, Y. J. & Huang, J. R., 2010 May 1, In : Automation in construction. 19, 3, p. 347-356 10 p.

Research output: Contribution to journalArticle

34 Citations (Scopus)
2006

An integrated modeling mechanism for optimizing the simulation model of the construction operation

Cheng, T. M., Feng, C. W. & Hsu, M. Y., 2006 May 1, In : Automation in construction. 15, 3, p. 327-340 14 p.

Research output: Contribution to journalArticle

12 Citations (Scopus)

Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks

Feng, C. W. & Wu, H. T., 2006 Mar 1, In : Automation in construction. 15, 2, p. 186-199 14 p.

Research output: Contribution to journalArticle

59 Citations (Scopus)
2005

A hybrid mechanism for optimizing construction simulation models

Cheng, T. M., Feng, C. W. & Chen, Y. L., 2005 Jan 1, In : Automation in construction. 14, 1, p. 85-98 14 p.

Research output: Contribution to journalArticle

26 Citations (Scopus)
2004

Optimizing the schedule of dispatching RMC trucks through genetic algorithms

Feng, C. W., Cheng, T. M. & Wu, H. T., 2004 May 1, In : Automation in construction. 13, 3, p. 327-340 14 p.

Research output: Contribution to journalArticle

75 Citations (Scopus)
2003

An effective simulation mechanism for construction operations

Cheng, T. M. & Feng, C. W., 2003 May 1, In : Automation in construction. 12, 3, p. 227-244 18 p.

Research output: Contribution to journalArticle

42 Citations (Scopus)
2000

Stochastic construction time-cost trade-off analysis

Feng, C. W., Liu, L. & Burns, S. A., 2000 Apr 1, In : Journal of Computing in Civil Engineering. 14, 2, p. 117-126 10 p.

Research output: Contribution to journalArticle

114 Citations (Scopus)
1997

Using genetic algorithms to solve construction time-cost trade-off problems

Feng, C-W., Liu, L. & Burns, S. A., 1997 Jan 1, In : Journal of Computing in Civil Engineering. 11, 3, p. 184-189 6 p.

Research output: Contribution to journalArticle

301 Citations (Scopus)
1996

The LP/IP hybrid method for construction time-cost trade-off analysis

Burns, S. A., Liu, L. & Feng, C. W., 1996 May, In : Construction Management and Economics. 14, 3, p. 265-276 12 p.

Research output: Contribution to journalArticle

81 Citations (Scopus)
1995

Construction time-cost trade-off analysis using LP/IP hybrid method

Liu, L., Burns, S. A. & Feng, C. W., 1995 Dec 1, In : Journal of Construction Engineering and Management. 121, 4, p. 446-454 9 p.

Research output: Contribution to journalArticle

97 Citations (Scopus)