T1 - A novel electrolytic capacitor-less multilevel inverter with coupled inductor
AU - Wu, Chi Shen
AU - Chen, Jiann-Fuh
AU - Liang, Tsorng-Juu
PY - 2017/1/9
Y1 - 2017/1/9
N2 - In this paper, a novel multilevel electrolytic capacitor-less inverter is proposed. With the three-winding coupled inductor, input voltage can be divided without electrolytic capacitors. Hence, no voltage-balancing circuit is needed. Less power switches are required for the proposed circuit compared to the existing topologies. Only ten switches are required to generate seven-level output. Finally, a laboratory prototype of seven-level inverter with 320V input voltage and 220 Vrms/3kW output is implemented. The efficiency under full load is 94.82%, the maximum efficiency is 96.39% under 74.34 % load. Extended circuit is also proposed.
AB - In this paper, a novel multilevel electrolytic capacitor-less inverter is proposed. With the three-winding coupled inductor, input voltage can be divided without electrolytic capacitors. Hence, no voltage-balancing circuit is needed. Less power switches are required for the proposed circuit compared to the existing topologies. Only ten switches are required to generate seven-level output. Finally, a laboratory prototype of seven-level inverter with 320V input voltage and 220 Vrms/3kW output is implemented. The efficiency under full load is 94.82%, the maximum efficiency is 96.39% under 74.34 % load. Extended circuit is also proposed.
UR - http://www.scopus.com/inward/record.url?scp=85012078110&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85012078110&partnerID=8YFLogxK
U2 - 10.1109/ACEPT.2016.7811521
DO - 10.1109/ACEPT.2016.7811521
M3 - Conference contribution
AN - SCOPUS:85012078110
T3 - 2016 Asian Conference on Energy, Power and Transportation Electrification, ACEPT 2016
BT - 2016 Asian Conference on Energy, Power and Transportation Electrification, ACEPT 2016
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2016 Asian Conference on Energy, Power and Transportation Electrification, ACEPT 2016
Y2 - 25 October 2016 through 27 October 2016