Skip to main navigation Skip to search Skip to main content

Adaptive load shedding method with time-based design for isolated power systems

Research output: Contribution to journalArticlepeer-review

Abstract

When an isolated power system encounters a serious disturbance or a large generator unit trip, the system frequency may drop if total generating power is not able to supply the load demand sufficiently. Since an isolated power system possesses a lower inertia with limited reserves, load shedding becomes a critical solution to restore system frequency. In this paper, the initial rate of change of frequency is first detected. A designated time interval and a modification algorithm that considers the maximum frequency change at the last step are integrated to complete a load shedding task. Features of the method include the easy determination of shedding loads and fast trip of the occurrence load in anticipation of avoiding the occurrence of over-shedding or under-shedding. Numerical simulations have solidified the effectiveness of the proposed method for the application.

Original languageEnglish
Pages (from-to)51-58
Number of pages8
JournalInternational Journal of Electrical Power and Energy System
Volume22
Issue number1
DOIs
Publication statusPublished - 2000 Jan

All Science Journal Classification (ASJC) codes

  • Energy Engineering and Power Technology
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Adaptive load shedding method with time-based design for isolated power systems'. Together they form a unique fingerprint.

Cite this