Abstract
Two approaches, the equivalent porous media (EPM) approach and the discrete fracture media (DFM) approach, are used to predict the groundwater seepage into the tunnel in the fractured formation. Result of simulation indicates that the predicted flow rates of both approaches have drastic discrepancies. It shows that an additional tunnel which is excavated underneath the original tunnel is more helpful to minimize the groundwater flow flushing out of an original tunnel than one which is excavated in other directions.
Original language | English |
---|---|
Pages (from-to) | 155-160 |
Number of pages | 6 |
Journal | Journal of the Chinese Institute of Engineers, Transactions of the Chinese Institute of Engineers,Series A/Chung-kuo Kung Ch'eng Hsuch K'an |
Volume | 23 |
Issue number | 2 |
DOIs | |
Publication status | Published - 2000 Jan 1 |