Delay Analysis and Computing Offloading of URLLC in Mobile Edge Computing Systems

Yifan Duan, Changyang She, Guodong Zhao, Tony Q.S. Quek

Research output: Chapter in Book/Report/Conference proceedingConference contribution

7 Citations (Scopus)

Abstract

In the fifth generation (5G) wireless communications, ultra-reliable and low-latency communications (URLLC) service that deliveries short packets will coexist with enhanced mobile broadband (eMBB) service with long packets. In this work, we study how to analyze delay and optimize offloading scheme of short packets in a mobile edge computing (MEC) system with both URLLC and eMBB services. To reduce computing delay for short packets, a processor-sharing (PS) server is deployed in the MEC system, where the total computing ability is equally allocated to all the packets in the server. As such, short packets can bypass long packets in the server. We derive a closed-form expression of the complimentary cumulative distribution function of latency experienced by short packets in the PS server, and minimize the end-To-end (E2E) delay of short packets by optimizing offloading probabilities subject to the reliability requirement. Simulation results validate our analysis and show that the PS server outperforms two kinds of first-come-first-serve servers in the scenarios with both short and long packets.

Original languageEnglish
Title of host publication2018 10th International Conference on Wireless Communications and Signal Processing, WCSP 2018
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781538661192
DOIs
Publication statusPublished - 2018 Nov 30
Event10th International Conference on Wireless Communications and Signal Processing, WCSP 2018 - Hangzhou, China
Duration: 2018 Oct 182018 Oct 20

Publication series

Name2018 10th International Conference on Wireless Communications and Signal Processing, WCSP 2018

Conference

Conference10th International Conference on Wireless Communications and Signal Processing, WCSP 2018
Country/TerritoryChina
CityHangzhou
Period18-10-1818-10-20

All Science Journal Classification (ASJC) codes

  • Computer Networks and Communications
  • Signal Processing
  • Safety, Risk, Reliability and Quality

Fingerprint

Dive into the research topics of 'Delay Analysis and Computing Offloading of URLLC in Mobile Edge Computing Systems'. Together they form a unique fingerprint.

Cite this