In its pursuit for providing smooth pavements, the Directorate General of Highways in Taiwan is developing and implementing ride quality specification as part of the construction assurance program. The straightedge and the profiler were used to measure pavement smoothness on 561 test sections. Probability distribution analysis showed that measurements of pavement smoothness of both devices follow the normal distribution. Smoothness specifications for construction quality control were developed for straightedge and profiler, respectively. The full-pay range is 1.36 to 2.45 mm and 2.16 to 3.65 m/km for straightedge and profiler, respectively. The smoothness relationship between straightedge and profiler was developed.

Original languageEnglish
JournalJournal of ASTM International
Volume3
Issue number8
DOIs
Publication statusPublished - 2006 Sep 18

Fingerprint

Smooth Pursuit
Normal Distribution
Taiwan
Pavements
Quality Control
Equipment and Supplies
Specifications
Normal distribution
Probability distributions
Quality control

All Science Journal Classification (ASJC) codes

  • Environmental Engineering
  • Materials Science(all)
  • Nuclear Energy and Engineering
  • Engineering(all)
  • Public Health, Environmental and Occupational Health

Cite this

@article{954d13f942f24ee2819f4bcf2650f7a8,
title = "Development of pavement smoothness index relationship",
abstract = "In its pursuit for providing smooth pavements, the Directorate General of Highways in Taiwan is developing and implementing ride quality specification as part of the construction assurance program. The straightedge and the profiler were used to measure pavement smoothness on 561 test sections. Probability distribution analysis showed that measurements of pavement smoothness of both devices follow the normal distribution. Smoothness specifications for construction quality control were developed for straightedge and profiler, respectively. The full-pay range is 1.36 to 2.45 mm and 2.16 to 3.65 m/km for straightedge and profiler, respectively. The smoothness relationship between straightedge and profiler was developed.",
author = "Chen, {Jian Shiuh} and Huang, {Chien Chung}",
year = "2006",
month = "9",
day = "18",
doi = "10.1520/JAI100484",
language = "English",
volume = "3",
journal = "Journal of ASTM International",
issn = "1546-962X",
publisher = "American Society for Testing and Materials",
number = "8",

}

Development of pavement smoothness index relationship. / Chen, Jian Shiuh; Huang, Chien Chung.

In: Journal of ASTM International, Vol. 3, No. 8, 18.09.2006.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Development of pavement smoothness index relationship

AU - Chen, Jian Shiuh

AU - Huang, Chien Chung

PY - 2006/9/18

Y1 - 2006/9/18

N2 - In its pursuit for providing smooth pavements, the Directorate General of Highways in Taiwan is developing and implementing ride quality specification as part of the construction assurance program. The straightedge and the profiler were used to measure pavement smoothness on 561 test sections. Probability distribution analysis showed that measurements of pavement smoothness of both devices follow the normal distribution. Smoothness specifications for construction quality control were developed for straightedge and profiler, respectively. The full-pay range is 1.36 to 2.45 mm and 2.16 to 3.65 m/km for straightedge and profiler, respectively. The smoothness relationship between straightedge and profiler was developed.

AB - In its pursuit for providing smooth pavements, the Directorate General of Highways in Taiwan is developing and implementing ride quality specification as part of the construction assurance program. The straightedge and the profiler were used to measure pavement smoothness on 561 test sections. Probability distribution analysis showed that measurements of pavement smoothness of both devices follow the normal distribution. Smoothness specifications for construction quality control were developed for straightedge and profiler, respectively. The full-pay range is 1.36 to 2.45 mm and 2.16 to 3.65 m/km for straightedge and profiler, respectively. The smoothness relationship between straightedge and profiler was developed.

UR - http://www.scopus.com/inward/record.url?scp=33748570095&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=33748570095&partnerID=8YFLogxK

U2 - 10.1520/JAI100484

DO - 10.1520/JAI100484

M3 - Article

AN - SCOPUS:33748570095

VL - 3

JO - Journal of ASTM International

JF - Journal of ASTM International

SN - 1546-962X

IS - 8

ER -