This paper presents the power-quality measurement results of a commercial wind farm (WF) connected to Taiwan Power System. This 46-MW Jang-Bin wind farm with twenty-three 2-MW doubly-fed induction generators (DFIGs) is connected to Jang-Bin extra high-voltage (EHV) substation of Taiwan Power Company (TPC) through six feeders and a step-up main transformer. The measured data were recorded from October 2 to November 6, 2013 for total 35 days. The recorded results include three-phase voltages, currents, active power, reactive power, apparent power, power factor, frequency, current harmonics, voltage flickers, and voltage variations. According to the measured results, it can be clearly observed that the power quality of the studied Jang-Bin wind farm during the measurement period can meet the grid code of TPC.

Original languageEnglish
Title of host publication2014 IEEE Industry Application Society Annual Meeting, IAS 2014
PublisherInstitute of Electrical and Electronics Engineers Inc.
ISBN (Electronic)9781479922888
DOIs
Publication statusPublished - 2014 Dec 5
Event2014 IEEE Industry Application Society Annual Meeting, IAS 2014 - Vancouver, Canada
Duration: 2014 Oct 52014 Oct 9

Publication series

Name2014 IEEE Industry Application Society Annual Meeting, IAS 2014

Other

Other2014 IEEE Industry Application Society Annual Meeting, IAS 2014
CountryCanada
CityVancouver
Period14-10-0514-10-09

Fingerprint

Power quality
Farms
Bins
Electric potential
Asynchronous generators
Reactive power
Industry

All Science Journal Classification (ASJC) codes

  • Computer Science Applications
  • Industrial and Manufacturing Engineering

Cite this

Lu, S. Y., Wang, L., Ke, S. C., Chang, C. H., & Yang, Z. H. (2014). Evaluation of measured power-quality results of a wind farm connected to Taiwan power system. In 2014 IEEE Industry Application Society Annual Meeting, IAS 2014 [6978483] (2014 IEEE Industry Application Society Annual Meeting, IAS 2014). Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/IAS.2014.6978483
Lu, Sheng Yen ; Wang, Li ; Ke, Shun Chin ; Chang, Che Hao ; Yang, Zhi Hao. / Evaluation of measured power-quality results of a wind farm connected to Taiwan power system. 2014 IEEE Industry Application Society Annual Meeting, IAS 2014. Institute of Electrical and Electronics Engineers Inc., 2014. (2014 IEEE Industry Application Society Annual Meeting, IAS 2014).
@inproceedings{3db487a836b64703a23ee37f77900891,
title = "Evaluation of measured power-quality results of a wind farm connected to Taiwan power system",
abstract = "This paper presents the power-quality measurement results of a commercial wind farm (WF) connected to Taiwan Power System. This 46-MW Jang-Bin wind farm with twenty-three 2-MW doubly-fed induction generators (DFIGs) is connected to Jang-Bin extra high-voltage (EHV) substation of Taiwan Power Company (TPC) through six feeders and a step-up main transformer. The measured data were recorded from October 2 to November 6, 2013 for total 35 days. The recorded results include three-phase voltages, currents, active power, reactive power, apparent power, power factor, frequency, current harmonics, voltage flickers, and voltage variations. According to the measured results, it can be clearly observed that the power quality of the studied Jang-Bin wind farm during the measurement period can meet the grid code of TPC.",
author = "Lu, {Sheng Yen} and Li Wang and Ke, {Shun Chin} and Chang, {Che Hao} and Yang, {Zhi Hao}",
year = "2014",
month = "12",
day = "5",
doi = "10.1109/IAS.2014.6978483",
language = "English",
series = "2014 IEEE Industry Application Society Annual Meeting, IAS 2014",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
booktitle = "2014 IEEE Industry Application Society Annual Meeting, IAS 2014",
address = "United States",

}

Lu, SY, Wang, L, Ke, SC, Chang, CH & Yang, ZH 2014, Evaluation of measured power-quality results of a wind farm connected to Taiwan power system. in 2014 IEEE Industry Application Society Annual Meeting, IAS 2014., 6978483, 2014 IEEE Industry Application Society Annual Meeting, IAS 2014, Institute of Electrical and Electronics Engineers Inc., 2014 IEEE Industry Application Society Annual Meeting, IAS 2014, Vancouver, Canada, 14-10-05. https://doi.org/10.1109/IAS.2014.6978483

Evaluation of measured power-quality results of a wind farm connected to Taiwan power system. / Lu, Sheng Yen; Wang, Li; Ke, Shun Chin; Chang, Che Hao; Yang, Zhi Hao.

2014 IEEE Industry Application Society Annual Meeting, IAS 2014. Institute of Electrical and Electronics Engineers Inc., 2014. 6978483 (2014 IEEE Industry Application Society Annual Meeting, IAS 2014).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Evaluation of measured power-quality results of a wind farm connected to Taiwan power system

AU - Lu, Sheng Yen

AU - Wang, Li

AU - Ke, Shun Chin

AU - Chang, Che Hao

AU - Yang, Zhi Hao

PY - 2014/12/5

Y1 - 2014/12/5

N2 - This paper presents the power-quality measurement results of a commercial wind farm (WF) connected to Taiwan Power System. This 46-MW Jang-Bin wind farm with twenty-three 2-MW doubly-fed induction generators (DFIGs) is connected to Jang-Bin extra high-voltage (EHV) substation of Taiwan Power Company (TPC) through six feeders and a step-up main transformer. The measured data were recorded from October 2 to November 6, 2013 for total 35 days. The recorded results include three-phase voltages, currents, active power, reactive power, apparent power, power factor, frequency, current harmonics, voltage flickers, and voltage variations. According to the measured results, it can be clearly observed that the power quality of the studied Jang-Bin wind farm during the measurement period can meet the grid code of TPC.

AB - This paper presents the power-quality measurement results of a commercial wind farm (WF) connected to Taiwan Power System. This 46-MW Jang-Bin wind farm with twenty-three 2-MW doubly-fed induction generators (DFIGs) is connected to Jang-Bin extra high-voltage (EHV) substation of Taiwan Power Company (TPC) through six feeders and a step-up main transformer. The measured data were recorded from October 2 to November 6, 2013 for total 35 days. The recorded results include three-phase voltages, currents, active power, reactive power, apparent power, power factor, frequency, current harmonics, voltage flickers, and voltage variations. According to the measured results, it can be clearly observed that the power quality of the studied Jang-Bin wind farm during the measurement period can meet the grid code of TPC.

UR - http://www.scopus.com/inward/record.url?scp=84925004125&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84925004125&partnerID=8YFLogxK

U2 - 10.1109/IAS.2014.6978483

DO - 10.1109/IAS.2014.6978483

M3 - Conference contribution

T3 - 2014 IEEE Industry Application Society Annual Meeting, IAS 2014

BT - 2014 IEEE Industry Application Society Annual Meeting, IAS 2014

PB - Institute of Electrical and Electronics Engineers Inc.

ER -

Lu SY, Wang L, Ke SC, Chang CH, Yang ZH. Evaluation of measured power-quality results of a wind farm connected to Taiwan power system. In 2014 IEEE Industry Application Society Annual Meeting, IAS 2014. Institute of Electrical and Electronics Engineers Inc. 2014. 6978483. (2014 IEEE Industry Application Society Annual Meeting, IAS 2014). https://doi.org/10.1109/IAS.2014.6978483