Abstract
In this study we evaluated the wind resources of wind farms in the Changhua offshore area of Taiwan. The offshore wind farm in Zone of Potential (ZoP) 26 was optimized through an economic evaluation. The annual energy production (AEP) of the offshore wind farm in ZoP 26 was predicted for 10 and 25 years with probabilities of 50%, 75%, and 90% by using measured mast data, measure-correlate-predict (MCP) data derived from Modern-Era Retrospective Analysis for Research and Applications (MERRA), and Central Weather Bureau (CWB) data. When the distance between the turbines in a wind farm was decreased from 12D to 6D, the turbine number increased from 53 to 132, while the capacity factor decreased slightly from 48.6% to 47.6%. MCP data derived from the inland CWB station with similar levels of wind resources can be used to accurately predict the power generation of the target offshore wind farm. The use of MCP with mast data as target data, together with CWB and MERRA data as reference data, proved to be a feasible method for predicting offshore wind power generation in places where a mast is available in a neighboring area.
Original language | English |
---|---|
Article number | 700 |
Journal | Energies |
Volume | 12 |
Issue number | 4 |
DOIs | |
Publication status | Published - 2019 Feb 21 |
All Science Journal Classification (ASJC) codes
- Renewable Energy, Sustainability and the Environment
- Building and Construction
- Fuel Technology
- Engineering (miscellaneous)
- Energy Engineering and Power Technology
- Energy (miscellaneous)
- Control and Optimization
- Electrical and Electronic Engineering