Reasons and costs for design change during production

A. S.T. Chang, J. S. Shih, Y. S. Choo

Research output: Contribution to journalArticlepeer-review

27 Citations (Scopus)

Abstract

Design change increases cost and time of production and redesign substantially. This research proposes a framework to investigate the reasons and their respective production change and redesign costs for design changes during production. It analyses 339 change items and interviews designers, owners and contractors of seven construction projects. Research findings show that design changes result from three categories of reasons: under owner's, designer's, and beyond control. The proportions of change reasons, construction change costs and redesign costs are different for the studied projects. The redesign costs are from 2.1% to 21.5% and on average 8.5% of the construction change cost, equivalent to the fee of a new design project. The identified reasons with quantitative cost behaviours can help clarify design change problems. Insight about design change can also be gained through the convergence of different perceptions of change reason proportions from project participants. The analysis process and results in this research can be referenced by other companies to obtain their own patterns of reasons, production change, and redesign costs from design changes to diagnose design performance.

Original languageEnglish
Pages (from-to)275-289
Number of pages15
JournalJournal of Engineering Design
Volume22
Issue number4
DOIs
Publication statusPublished - 2011 Apr

All Science Journal Classification (ASJC) codes

  • Engineering(all)

Fingerprint Dive into the research topics of 'Reasons and costs for design change during production'. Together they form a unique fingerprint.

Cite this