TY - GEN
T1 - System setup consideration for range gated imaging
AU - Chua, Sing Yee
AU - Guo, Ningqun
AU - Tan, Ching Seong
AU - Chew, Kuew Wai
AU - Chang, Shoou Jinn
AU - Wang, Xin
N1 - Publisher Copyright:
© 2018 Optics InfoBase Conference Papers. All rights reserved.
PY - 2017
Y1 - 2017
N2 - Despite the advances made in laser and sensor technology, setting up an accurate range gated imaging system remains a challenge. In this paper, we emphasise on the importance of system setup and its impacts to the performance of three-dimensional (3D) range gated reconstruction. Study is performed to analyse some of the system setup criteria and parameters involved in the laser and camera synchronisation, images acquisition and reconstruction, and illumination setup. It is hoped that the presented findings establish better understanding of the setup influences in range gated reconstruction and contribute to optimise the system performance.
AB - Despite the advances made in laser and sensor technology, setting up an accurate range gated imaging system remains a challenge. In this paper, we emphasise on the importance of system setup and its impacts to the performance of three-dimensional (3D) range gated reconstruction. Study is performed to analyse some of the system setup criteria and parameters involved in the laser and camera synchronisation, images acquisition and reconstruction, and illumination setup. It is hoped that the presented findings establish better understanding of the setup influences in range gated reconstruction and contribute to optimise the system performance.
UR - http://www.scopus.com/inward/record.url?scp=85059539542&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85059539542&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:85059539542
SN - 9781509062904
T3 - Optics InfoBase Conference Papers
BT - Conference on Lasers and Electro-Optics/Pacific Rim, CLEOPR 2017
PB - Optica Publishing Group (formerly OSA)
T2 - Conference on Lasers and Electro-Optics/Pacific Rim, CLEOPR 2017
Y2 - 31 July 2017 through 4 August 2017
ER -