TY - GEN
T1 - Transient analysis of Jang-Bin wind farm connected to Taiwan power system
AU - Wang, Li
AU - Wu, Cheng Tai
AU - Chang, Che Hao
PY - 2013/12/1
Y1 - 2013/12/1
N2 - This paper presents the transient analyzed results of Jang-Bin wind farm connected to the simplified Taiwan Power System through a transmission line. The q-d axis equivalent-circuit model is developed to establish the complete system model by integrating the 46-MW wind farm and the simplified Taiwan Power System under three-phase balanced loading conditions. It can be concluded from the transient analyzed simulation results that the studied simplified Taiwan Power System connected with Jang-Bin wind farm is stable subject to a severe fault.
AB - This paper presents the transient analyzed results of Jang-Bin wind farm connected to the simplified Taiwan Power System through a transmission line. The q-d axis equivalent-circuit model is developed to establish the complete system model by integrating the 46-MW wind farm and the simplified Taiwan Power System under three-phase balanced loading conditions. It can be concluded from the transient analyzed simulation results that the studied simplified Taiwan Power System connected with Jang-Bin wind farm is stable subject to a severe fault.
UR - http://www.scopus.com/inward/record.url?scp=84897742928&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84897742928&partnerID=8YFLogxK
U2 - 10.1109/CACS.2013.6734178
DO - 10.1109/CACS.2013.6734178
M3 - Conference contribution
AN - SCOPUS:84897742928
SN - 9781479923847
T3 - 2013 CACS International Automatic Control Conference, CACS 2013 - Conference Digest
SP - 455
EP - 461
BT - 2013 CACS International Automatic Control Conference, CACS 2013 - Conference Digest
T2 - 2013 CACS International Automatic Control Conference, CACS 2013
Y2 - 2 December 2013 through 4 December 2013
ER -