4D animation reconstruction from multi-camera coordinates transformation

J. P. Jhan, J. Y. Rau, C. M. Chou

研究成果: Conference article同行評審

1 引文 斯高帕斯(Scopus)

摘要

Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant- Trunk Steel Pipe (ETSP) in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis

All Science Journal Classification (ASJC) codes

  • Information Systems
  • Geography, Planning and Development

指紋 深入研究「4D animation reconstruction from multi-camera coordinates transformation」主題。共同形成了獨特的指紋。

引用此