Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant- Trunk Steel Pipe (ETSP) in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis

指紋

Cofferdams
cofferdam
Animation
Tunnels
reconstruction
tunnel
Cameras
Dredging
dredging
water
Ship model tanks
towing
cost reduction
Photogrammetry
Water injection
Launching
Steel pipe
dynamic analysis
elephant
photogrammetry

All Science Journal Classification (ASJC) codes

  • Information Systems
  • Geography, Planning and Development

引用此文

@article{138220375d964b75968bf2dcc07f1a13,
title = "4D animation reconstruction from multi-camera coordinates transformation",
abstract = "Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant- Trunk Steel Pipe (ETSP) in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis",
author = "Jhan, {J. P.} and Rau, {J. Y.} and Chou, {C. M.}",
year = "2016",
month = "1",
day = "1",
doi = "10.5194/isprsarchives-XLI-B5-841-2016",
language = "English",
volume = "41",
pages = "841--847",
journal = "International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives",
issn = "1682-1750",

}

TY - JOUR

T1 - 4D animation reconstruction from multi-camera coordinates transformation

AU - Jhan, J. P.

AU - Rau, J. Y.

AU - Chou, C. M.

PY - 2016/1/1

Y1 - 2016/1/1

N2 - Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant- Trunk Steel Pipe (ETSP) in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis

AB - Reservoir dredging issues are important to extend the life of reservoir. The most effective and cost reduction way is to construct a tunnel to desilt the bottom sediment. Conventional technique is to construct a cofferdam to separate the water, construct the intake of tunnel inside and remove the cofferdam afterwards. In Taiwan, the ZengWen reservoir dredging project will install an Elephant- Trunk Steel Pipe (ETSP) in the water to connect the desilting tunnel without building the cofferdam. Since the installation is critical to the whole project, a 1:20 model was built to simulate the installation steps in a towing tank, i.e. launching, dragging, water injection, and sinking. To increase the construction safety, photogrammetry technic is adopted to record images during the simulation, compute its transformation parameters for dynamic analysis and reconstruct the 4D animations. In this study, several Australis

UR - http://www.scopus.com/inward/record.url?scp=84979225461&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84979225461&partnerID=8YFLogxK

U2 - 10.5194/isprsarchives-XLI-B5-841-2016

DO - 10.5194/isprsarchives-XLI-B5-841-2016

M3 - Conference article

AN - SCOPUS:84979225461

VL - 41

SP - 841

EP - 847

JO - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives

JF - International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences - ISPRS Archives

SN - 1682-1750

ER -