A time-oriented approach to load shedding design of an electrical power system is proposed in this paper. To overcome the coordination difficulty among under-frequency relay settings, the time-oriented concept has been incorporated into the proposed scheme. Meanwhile, to decrease the possibility of load-shedding failure caused by distinct system dynamics, a modification method that considers maximum deviation of frequency at the last load-shedding step has also been added into the scheme. Using this method, the total amount of load to be shed can be calculated more accurately. The decline of the system frequency can be also better grasped. Numerical simulations have been performed to verify the effectiveness of the proposed method.
| 原文 | English |
|---|---|
| 頁(從 - 到) | 195-201 |
| 頁數 | 7 |
| 期刊 | Proceedings of the National Science Council, Republic of China, Part A: Physical Science and Engineering |
| 卷 | 25 |
| 發行號 | 3 |
| 出版狀態 | Published - 2001 5月 |
All Science Journal Classification (ASJC) codes
- 一般工程
指紋
深入研究「A time-oriented approach for the load-Shedding design in an isolated power system」主題。共同形成了獨特的指紋。引用此
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver