Assessing the commercial potential of IGCC polygeneration/power plants integrated with chemical-looping processes

Wei Wu, Fang Wen, Bin Shi

研究成果: Article同行評審

10 引文 斯高帕斯(Scopus)

摘要

The techno-economic analysis of an IGCC power plant coupled with integrated intermittent chemical looping air separation (IICLAS) as Design 1 and an IGCC polygeneration plant integrated with chemical looping hydrogen generation (CLHG) as Design 2 are addressed. The economic evaluations show that (i) the total overnight cost of capital (TOCC) of Design 1 is higher than it of Design 2 by 3.6% and (ii) the total fixed and variable operation and maintenance cost (TOMC) of Design 1 is higher than it of Design 2 by 17.8%. These comparisons imply that the potential investment opportunities in Design 2 are more than Design 1. According to recent reports of the internal rate of return (IRR) for the coal-fired power plant investment around 8%∼12%, Design 2 guarantees the minimum acceptable IRR with 14.1% even though its revenue is reduced by 30%. For assessing the levelized cost of energy (LCOE) with 0.058USD/kWh and the dynamic payback period (DPP) with 6.6 years, these beneficial results raise the commercial potential of Design 2.

原文English
頁(從 - 到)296-305
頁數10
期刊Journal of the Taiwan Institute of Chemical Engineers
112
DOIs
出版狀態Published - 2020 7月

All Science Journal Classification (ASJC) codes

  • 化學 (全部)
  • 化學工程 (全部)

指紋

深入研究「Assessing the commercial potential of IGCC polygeneration/power plants integrated with chemical-looping processes」主題。共同形成了獨特的指紋。

引用此