In the burn-in-test of three-phase on-line uninterruptible power supply (UPS) system, R.L.C. is usually used as a load in conventional method. For saving energy and decreasing the test cost of UPS, the energy feedback method is proposed to apply the test of the on-line UPS. In this method, the utility system is used instead of a load. A voltage regulator is used in parallel operation to turn back the energy, which was dissipated in conventional, to the utility system.