Defining cost/schedule performance indices and their ranges for design projects

研究成果: Article同行評審

23 引文 斯高帕斯(Scopus)

摘要

Cost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From observing design operations, the C/SPIs were defined at project and milestone levels, and their characteristics were identified. The value ranges, representing different degrees of performance, were determined from related research and tested by real data. The results show that the values and scores derived from the defined ranges effectively differentiate performance, which means the C/SPIs and ranges are well defined. The two-level C/SPIs and value ranges can enhance the application of the earned value concept and evaluate design project performance more systematically and accurately.

原文English
頁(從 - 到)122-130
頁數9
期刊Journal of Management in Engineering
17
發行號2
DOIs
出版狀態Published - 2001 3月

All Science Journal Classification (ASJC) codes

  • 勞資關係
  • 一般工程
  • 策略與管理
  • 管理科學與經營研究

指紋

深入研究「Defining cost/schedule performance indices and their ranges for design projects」主題。共同形成了獨特的指紋。

引用此