Delay analysis of heterogeneous cellular networks

Gongzheng Zhang, Aiping Huang, Tony Q.S. Quek, Hangguan Shan

研究成果: Conference contribution

1 引文 斯高帕斯(Scopus)

摘要

Due to a wider range of services in future heterogeneous cellular network (HCN), packet transmission delay becomes a more essential performance metric for system design. In this paper, we propose an analytical framework to derive the delay performance of HCN in terms of local delay, by modeling the locations of base stations (BSs) in HCN as superimposed of independent Poisson point processes. In the analysis, the BS activity and temporal correlation of transmissions are taken into consideration, both of which have significant effect on network performance. The effect of mobility, BS density, and association bias factor is investigated through numerical results, which shows that network performance derived ignoring the temporal correlation of transmissions is optimistic.

原文English
主出版物標題SPAWC 2015 - 16th IEEE International Workshop on Signal Processing Advances in Wireless Communications
發行者Institute of Electrical and Electronics Engineers Inc.
頁面176-180
頁數5
ISBN(電子)9781479919307
DOIs
出版狀態Published - 2015 八月 27
事件16th IEEE International Workshop on Signal Processing Advances in Wireless Communications, SPAWC 2015 - Stockholm, Sweden
持續時間: 2015 六月 282015 七月 1

出版系列

名字IEEE Workshop on Signal Processing Advances in Wireless Communications, SPAWC
2015-August

Conference

Conference16th IEEE International Workshop on Signal Processing Advances in Wireless Communications, SPAWC 2015
國家/地區Sweden
城市Stockholm
期間15-06-2815-07-01

All Science Journal Classification (ASJC) codes

  • 電氣與電子工程
  • 電腦科學應用
  • 資訊系統

指紋

深入研究「Delay analysis of heterogeneous cellular networks」主題。共同形成了獨特的指紋。

引用此