台灣營建工程之延誤因素,頻率及責任

His Chuan Hsueh, Chien Sheng Wu, Andrew S. Chang

研究成果: Article同行評審

摘要

Delay is common for the construction projects and has different patterns in different countries. This study aimed to identify delay factors, frequency and responsibility of construction projects in Taiwan. Delay factors were analyzed and compared after being identified from literature, government database, and lawsuit cases. The factors identified from the above sources were found with consistency. The research results indicate that the construction delays in Taiwan have its own phenomena but have similarity with those of other countries. In Taiwan, the owners were responsible for over 50% of all delays. Land acquisition delay and design change occurred most frequently. The contractor's delays were resulted from insufficient site investigation and poor management. The value of this study is the characterics and patterns of the construction delays concluded by combining factors, frequency, occurrence stage and responsibility. A framework was proposed to include the four dimensions to provide needed delay information. It is simple to understand and can be used as a tool to trace delays.

貢獻的翻譯標題Delay Factors, Frequency and Responsibility of Construction Projects in Taiwan
原文???core.languages.zh_ZH???
頁(從 - 到)195-204
頁數10
期刊Journal of the Chinese Institute of Civil and Hydraulic Engineering
29
發行號3
DOIs
出版狀態Published - 2017 九月 1

All Science Journal Classification (ASJC) codes

  • Civil and Structural Engineering

指紋 深入研究「台灣營建工程之延誤因素,頻率及責任」主題。共同形成了獨特的指紋。

引用此