Design and construction coordination problems and planning for design-build project new users

Andrew S. Chang, Fang Ying Shen, William Ibbs

研究成果: Article同行評審

16 引文 斯高帕斯(Scopus)

摘要

Design-build (DB) is adopted as a project delivery method in hopes to improve performance. Previous studies focus on upstream issues such as conditions for adoption and contractor selection, but few address the design and construction coordination issues that are very likely to be encountered in execution by new users. This paper investigates coordination problems arising from design and construction concurrence and solutions by studying five ongoing DB projects and interviewing nine major contract parties. Inconsistent application of the design and construction process and infrequent feedback are two major problems found to have high influence on DB execution. A work unit planning process with five steps is presented in this paper to help better manage the design and construction coordination of a DB project.

原文English
頁(從 - 到)1525-1534
頁數10
期刊Canadian Journal of Civil Engineering
37
發行號12
DOIs
出版狀態Published - 2010 十一月

All Science Journal Classification (ASJC) codes

  • 土木與結構工程
  • 環境科學 (全部)

指紋

深入研究「Design and construction coordination problems and planning for design-build project new users」主題。共同形成了獨特的指紋。

引用此