Estimation of product development cycle time resulting from early supplier involvement

J. Lyu, C. K. Chang, L. Y. Chang

研究成果: Article同行評審

2 引文 斯高帕斯(Scopus)

摘要

Early supplier involvement (ESI) is widely applied to improve the product development process and has been proved to be able to shorten product development cycle time. The current study presents a systematic approach to support enterprises in selecting suitable tasks for implementing ESI. In order to estimate the influence of ESI on product development cycle time, the proposed method analyses complex product development processes to determine how to implement collaborative design appropriately via design structure matrix. This approach integrates an analysis of the binary design structure matrix, two-dimensional variables (sensitivity and variability), and the amount of overlapping of the tasks to discuss complex issues associated with product development cycle time. By applying the influence analysis to overlapping, the study identifies suitable tasks and the priority of each task to collaborative design. Finally, a simplified case study is discussed to demonstrate how enterprises can utilize the proposed method.

原文English
頁(從 - 到)507-515
頁數9
期刊Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture
224
發行號3
DOIs
出版狀態Published - 2010 三月 1

All Science Journal Classification (ASJC) codes

  • Mechanical Engineering
  • Industrial and Manufacturing Engineering

指紋 深入研究「Estimation of product development cycle time resulting from early supplier involvement」主題。共同形成了獨特的指紋。

引用此