Exploring coordination goals of construction projects

  • Fang Ying Shen
  • , Andrew S. Chang

研究成果: Article同行評審

8   !!Link opens in a new tab 引文 斯高帕斯(Scopus)

摘要

Effective coordination has been regarded in both theory and practice as a critical factor of success in construction projects. Previous coordination studies have focused on the time spent on coordination, its frequency, and its relationship with performance. However, coordination goals have received less attention, and their relationships with coordination methods and performance are not known. This paper studies coordination methods and goals for construction projects to identify what coordination goals are adopted and to what extent goals are achieved. In the research process, eight coordination methods and six goals were derived. A questionnaire was designed accordingly and sent to seven contractors for survey. Follow-up interviews were conducted with three or four managers and engineers from each contractor. The analysis results indicate that most coordination methods have multiple goals; written coordination methods such as plans, schedules, reports, and contract documents tend to have appropriate goals; and projects performed well by using coordination methods effectively to achieve the coordination goals.

原文English
頁(從 - 到)90-96
頁數7
期刊Journal of Management in Engineering
27
發行號2
DOIs
出版狀態Published - 2011 4月 1

All Science Journal Classification (ASJC) codes

  • 勞資關係
  • 一般工程
  • 策略與管理
  • 管理科學與經營研究

指紋

深入研究「Exploring coordination goals of construction projects」主題。共同形成了獨特的指紋。

引用此