Highly efficient recovery of ruthenium from integrated circuit (IC) manufacturing wastewater by Al reduction and cementation

研究成果: Article同行評審

18   !!Link opens in a new tab 引文 斯高帕斯(Scopus)

摘要

Ruthenium (Ru) is a rare-earth metal, which is employed widely in metal-processing industries. This study recovered Ru from the wastewater of an IC foundry by cementation using metallic aluminum (Al) powder as the sacrificial agent. Ru ions were efficiently reduced to the metal and coagulated with the derived aluminum hydroxide flocs. Experimental parameters included the particle size of Al, molar ratio of Al to Ru, initial Ru concentration and operation temperature. The recovery rate reached 99% under these conditions: Particle size Al powder = 88-128 μm, Al/Ru molar ratio = 2.0, initial Ru = 200 mg L-1, temperature = 338.16 K, reaction time = 120 min, stirring speed = 150 rpm. The cemented Ru over Al powder was spherical with a rough surface. Kinetic modelling suggested that the diffusion of Ru through the ash layer of Al powder controlled the reaction rate with an activation energy of 40.75 kJ mol-1. A brief cost analysis demonstrated that the cementation of Ru yielded a profit of $0.180 per 0.1 m3-wastewater.

原文English
頁(從 - 到)25303-25308
頁數6
期刊RSC Advances
9
發行號44
DOIs
出版狀態Published - 2019

All Science Journal Classification (ASJC) codes

  • 一般化學
  • 一般化學工程

指紋

深入研究「Highly efficient recovery of ruthenium from integrated circuit (IC) manufacturing wastewater by Al reduction and cementation」主題。共同形成了獨特的指紋。

引用此