Integrating process and work breakdown structure with design structure matrix

Jonathan Lee, Whan Yo Deng, Wen Tin Lee, Shin Jie Lee, Kuo Hsun Hsu, Shang Pin Ma

研究成果: Article同行評審

12 引文 斯高帕斯(Scopus)

摘要

In software development, project plans document scope, cost, effort, and schedule, guide project managers, and control project execution. Developing a project plan without incorporating how an organization doing things - i.e., organizational culture - may lead to project failure. To ensure stable process performance and to benefit from organizational culture, it is crucial that organizational processes be taken into account in project planning. Organizational processes enable stable process performance across an organization and provide a basis for cumulative, longterm benefits to the organization. In proposing a systematic approach that supports bi-directional transformation between processes and the Work Breakdown Structure (WBS), we propose Process2WBS and WBS2Process to assist project managers in project planning with an organization's set of standard processes. Process2WBS consumes processes and transforms them into a WBS with Design Structure Matrix (DSM) analysis, and WBS2Process transforms the WBS with project-specific information into executable processes expressed in XPDL.

原文English
頁(從 - 到)512-522
頁數11
期刊Journal of Advanced Computational Intelligence and Intelligent Informatics
14
發行號5
DOIs
出版狀態Published - 2010 7月

All Science Journal Classification (ASJC) codes

  • 人機介面
  • 電腦視覺和模式識別
  • 人工智慧

指紋

深入研究「Integrating process and work breakdown structure with design structure matrix」主題。共同形成了獨特的指紋。

引用此