T1 - Lead time reduction by extended MPS system in the supply Chain
AU - Lyu, Jr Jung
AU - Su, Hwan Yann
PY - 2009/12/1
Y1 - 2009/12/1
N2 - The problems which frequently challenge the management of a supply chain including uncertainty of customers' demands, high inventory levels and costs, inaccurate due date estimation, and slow response to customer inquiries are addressed. Lead time reduction is a critical issue which enables manufacturers to solve problems. The proposed extended master production scheduling (MPS) system, developed using Internet technology, can be deployed in a supply chain environment. A case study is used to illustrate the implementation process of the system and accompanying benefits.
AB - The problems which frequently challenge the management of a supply chain including uncertainty of customers' demands, high inventory levels and costs, inaccurate due date estimation, and slow response to customer inquiries are addressed. Lead time reduction is a critical issue which enables manufacturers to solve problems. The proposed extended master production scheduling (MPS) system, developed using Internet technology, can be deployed in a supply chain environment. A case study is used to illustrate the implementation process of the system and accompanying benefits.
UR - http://www.scopus.com/inward/record.url?scp=84866395152&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84866395152&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:84866395152
SN - 9781848827615
T3 - Global Perspective for Competitive Enterprise, Economy and Ecology - Proceedings of the 16th ISPE International Conference on Concurrent Engineering
SP - 593
EP - 600
BT - Global Perspective for Competitive Enterprise, Economy and Ecology - Proceedings of the 16th ISPE International Conference on Concurrent Engineering
T2 - 16th ISPE International Conference on Concurrent Engineering, CE 2009
Y2 - 20 July 2009 through 24 July 2009
ER -