TY - JOUR
T1 - Multiple product admission control in semiconductor manufacturing systems with process queue time (PQT) constraints
AU - Wu, Cheng Hung
AU - Chien, Wen Chi
AU - Chuang, Ya Tang
AU - Cheng, Yu Ching
N1 - Funding Information:
This research was supported in part by the Ministry of Science and Technology, Taiwan , under Grant Nos. NSC-97-2221-E-002-154-MY3 , MoST-105-2923-E-002-009-MY3 , and MoST-103-2221-E-002-229-MY2 .
Publisher Copyright:
© 2016 Elsevier Ltd
PY - 2016/9/1
Y1 - 2016/9/1
N2 - In a multi-product manufacture system, the complexity of production control increases. Because multiple products are competing for limited resource, managers need to dynamically adjust production priority based on customer demand and distribution of work-in-processes (WIP). The production control in multi-product system becomes even more complicated when process queue time (PQT) constraints exist. Under PQT constraints, administrators setup upper limits for the waiting time between specific manufacturing steps to ensure quality of products. This upper limit of waiting time makes dynamic production control very challenging. The objective of this paper is to develop production control methods for multi-product systems subject to PQT constraints. However, it is computationally infeasible to solve multiple product problems in a single dynamic optimization model, and we therefore first formulate a single product admission control problems using Markov decision processes (MDP). Based on observations from the single product MDP model, an innovative multiple product admission control (MPAC) heuristic is developed. In simulation study, we compare the performance of MPAC with other popular dispatching methods in literature. Compare to other control methods in literature, the proposed (MPAC) method can reduce production costs by at least 33.8% and reduce scrap count by at least 59.5% in average.
AB - In a multi-product manufacture system, the complexity of production control increases. Because multiple products are competing for limited resource, managers need to dynamically adjust production priority based on customer demand and distribution of work-in-processes (WIP). The production control in multi-product system becomes even more complicated when process queue time (PQT) constraints exist. Under PQT constraints, administrators setup upper limits for the waiting time between specific manufacturing steps to ensure quality of products. This upper limit of waiting time makes dynamic production control very challenging. The objective of this paper is to develop production control methods for multi-product systems subject to PQT constraints. However, it is computationally infeasible to solve multiple product problems in a single dynamic optimization model, and we therefore first formulate a single product admission control problems using Markov decision processes (MDP). Based on observations from the single product MDP model, an innovative multiple product admission control (MPAC) heuristic is developed. In simulation study, we compare the performance of MPAC with other popular dispatching methods in literature. Compare to other control methods in literature, the proposed (MPAC) method can reduce production costs by at least 33.8% and reduce scrap count by at least 59.5% in average.
UR - http://www.scopus.com/inward/record.url?scp=84965025692&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84965025692&partnerID=8YFLogxK
U2 - 10.1016/j.cie.2016.04.003
DO - 10.1016/j.cie.2016.04.003
M3 - Article
AN - SCOPUS:84965025692
SN - 0360-8352
VL - 99
SP - 347
EP - 363
JO - Computers and Industrial Engineering
JF - Computers and Industrial Engineering
ER -