T1 - On-call contracting strategy and management
AU - Chang, Andrew S.
AU - Ibbs, C. William
PY - 1998/1/1
Y1 - 1998/1/1
N2 - The purpose of this paper is to present an on-call contracting process model. On-call contracting is a strategy in which the owner initially signs a master contract with one party for a project and then divides the project work into task orders that are released to the party in phases. It is a contracting strategy tailored from traditional contracting methods, and applicable to consultant services. It is a flexible method that can retain the advantages of traditional strategies while avoiding or minimizing their disadvantages. It can make the consultant more attentive to the work. On-call contracting needs to follow principles and guidelines in order to be effective. Three principles - complete planning, overlapping, and design management - are derived from project scope freezing, concurrent engineering, and construction management, respectively. Task order planning is the core process of on-call contracting and includes four steps: (1) divide overall work; (2) group tasks into task order; (3) define task orders; and (4) issue task orders. Guidelines for task order planning are presented within these steps.
AB - The purpose of this paper is to present an on-call contracting process model. On-call contracting is a strategy in which the owner initially signs a master contract with one party for a project and then divides the project work into task orders that are released to the party in phases. It is a contracting strategy tailored from traditional contracting methods, and applicable to consultant services. It is a flexible method that can retain the advantages of traditional strategies while avoiding or minimizing their disadvantages. It can make the consultant more attentive to the work. On-call contracting needs to follow principles and guidelines in order to be effective. Three principles - complete planning, overlapping, and design management - are derived from project scope freezing, concurrent engineering, and construction management, respectively. Task order planning is the core process of on-call contracting and includes four steps: (1) divide overall work; (2) group tasks into task order; (3) define task orders; and (4) issue task orders. Guidelines for task order planning are presented within these steps.
UR - http://www.scopus.com/inward/record.url?scp=0032121540&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=0032121540&partnerID=8YFLogxK
U2 - 10.1061/(ASCE)0742-597X(1998)14:4(35)
DO - 10.1061/(ASCE)0742-597X(1998)14:4(35)
M3 - Review article
AN - SCOPUS:0032121540
VL - 14
SP - 35
EP - 44
JO - Journal of Management in Engineering - ASCE
JF - Journal of Management in Engineering - ASCE
SN - 0742-597X
IS - 4
ER -