This paper presents a discussion of practical experience related to the study of a cogeneration system where one of the four steam units occurs a failure of the low-pressure blades during peak load times of the summer months in Taiwan in the year 2007. This study investigates various scenarios consisting of shutting down the damaged unit for repairs and having continued operation of the unit by removing the low-pressure blades and replacing the stationary blade ring with buffer boards. Based on the simulation results, the numerical model has reflected strong agreement with the critical decisions made to operate the damaged unit continuously in a time of the blade failure.
原文 | English |
---|---|
頁(從 - 到) | 7415-7433 |
頁數 | 19 |
期刊 | Energies |
卷 | 7 |
發行號 | 11 |
DOIs | |
出版狀態 | Published - 2014 |
All Science Journal Classification (ASJC) codes
- 可再生能源、永續發展與環境
- 能源工程與電力技術
- 能源(雜項)
- 控制和優化
- 電氣與電子工程