In scrum, the development team is responsible for converting the selected product backlog items of a sprint to a "done"product increment. In sprint planning, the team develops product functionality to fulfill the selected product backlog items. In order to implement the product functionality, the team plans needed activities and then decomposes the activities into tasks. When dependent tasks are assigned to different developers, there is need for coordination between developers. The needs of coordination are difficult to quantify, however, quantification of the needs of coordination is an important factor to accurately estimate team performance of a sprint. In this paper, a method is proposed to calculate distribution of task dependency among developers, and the distribution is defined as Coordination Needs. An experiment on an open source project, Spring, demonstrates that the Coordination Needs is strongly correlated with team performance. With the method, the Coordination Needs of task allocation is revealed so team performance of a sprint can be accurately estimated, and task allocation can be optimized.

原文English
主出版物標題Proceedings - 2020 International Computer Symposium, ICS 2020
發行者Institute of Electrical and Electronics Engineers Inc.
頁面491-496
頁數6
ISBN(電子)9781728192550
DOIs
出版狀態Published - 2020 12月
事件2020 International Computer Symposium, ICS 2020 - Tainan, Taiwan
持續時間: 2020 12月 172020 12月 19

出版系列

名字Proceedings - 2020 International Computer Symposium, ICS 2020

Conference

Conference2020 International Computer Symposium, ICS 2020
國家/地區Taiwan
城市Tainan
期間20-12-1720-12-19

All Science Journal Classification (ASJC) codes

  • 人工智慧
  • 電腦網路與通信
  • 電腦科學應用
  • 資訊系統
  • 資訊系統與管理
  • 計算數學

指紋

深入研究「Revealing Coordination Needs from Task Allocation for Team Performance Estimation」主題。共同形成了獨特的指紋。

引用此