Time-based load shedding protection for isolated power systems

Chin Chyr Huang, Shyh Jier Huang

研究成果: Article同行評審

9 引文 斯高帕斯(Scopus)

摘要

When an isolated power system experiences a serious disturbance or heavy load trip, the system frequency may drop and even collapse if the total generating power does not supply the system demand sufficiently. Since an isolated power system possesses a lower inertia and comes with limited reserves, the load shedding becomes an important strategy to restore system frequency. The initial rate of change of frequency is useful to detect an overload when the disturbance happens. This paper presents a method to determine the load shedding criteria by detecting the initial rate of change of frequency with modification from the maximum frequency change at the last step to satisfy system dynamics simultaneously. Numerical simulations show that the proposed method helps determine the amount of shedded load and trip them promptly in order to avoid over- or under-shedding. By these results, the feasibility of the proposed method in power system applications is demonstrated.

原文English
頁(從 - 到)161-169
頁數9
期刊Electric Power Systems Research
52
發行號2
DOIs
出版狀態Published - 1999 十一月 1

All Science Journal Classification (ASJC) codes

  • 能源工程與電力技術
  • 電氣與電子工程

指紋

深入研究「Time-based load shedding protection for isolated power systems」主題。共同形成了獨特的指紋。

引用此