Using bim model and genetic algorithms to optimize the crew assignment for construction project planning

Yi Jao Chen, Chung Wei Feng, Yu Ren Wang, Hsueh Ming Wu

研究成果: Article同行評審

18 引文 斯高帕斯(Scopus)

摘要

Project planning is among the most critical factors to the success of a construction project. In project planning, cost and schedule are closely interrelated, because they share a lot of common data in their planning processes. Therefore, the integration of cost and schedule functions has been an attractive issue in construction project planning. Many researchers have emphasized the benefits of this integration and several different methodologies combining cost and schedule data have been provided. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project planning. This paper presents a model-based planning system that employs Building Information Model (BIM), Object Sequencing Matrix (OSM), and Genetic Algorithms (GAs) to obtain an optimal crew assignment under resource and workspace constraints. The purposes are to evaluate the project costs and optimize the temporal distribution of resources in project planning. A computer implementation called Cost/Schedule Integrated Planning System (CSIPS) is also developed to verify the feasibility of the proposed approach.

原文English
頁(從 - 到)179-188
頁數10
期刊International Journal of Technology
2
發行號3
出版狀態Published - 2011 7月

All Science Journal Classification (ASJC) codes

  • 一般工程
  • 策略與管理
  • 技術與創新管理

指紋

深入研究「Using bim model and genetic algorithms to optimize the crew assignment for construction project planning」主題。共同形成了獨特的指紋。

引用此