Using single significant factor in due-date assignment rules for dynamic job shops

Feng Chang R. Chang, Jrjung Lyu

研究成果: Chapter

摘要

Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.

原文English
主出版物標題Technical Paper - Society of Manufacturing Engineers. MR
發行者SME
出版狀態Published - 1998 十二月 1
事件Proceedings of the NAMRX XXVI Conference - Atlanta, GA, USA
持續時間: 1998 五月 191998 五月 22

Other

OtherProceedings of the NAMRX XXVI Conference
城市Atlanta, GA, USA
期間98-05-1998-05-22

All Science Journal Classification (ASJC) codes

  • Engineering(all)

引用此文

Chang, F. C. R., & Lyu, J. (1998). Using single significant factor in due-date assignment rules for dynamic job shops. 於 Technical Paper - Society of Manufacturing Engineers. MR SME.
Chang, Feng Chang R. ; Lyu, Jrjung. / Using single significant factor in due-date assignment rules for dynamic job shops. Technical Paper - Society of Manufacturing Engineers. MR. SME, 1998.
@inbook{89d692b433974ba580e16fce1aa12d87,
title = "Using single significant factor in due-date assignment rules for dynamic job shops",
abstract = "Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.",
author = "Chang, {Feng Chang R.} and Jrjung Lyu",
year = "1998",
month = "12",
day = "1",
language = "English",
booktitle = "Technical Paper - Society of Manufacturing Engineers. MR",
publisher = "SME",

}

Chang, FCR & Lyu, J 1998, Using single significant factor in due-date assignment rules for dynamic job shops. 於 Technical Paper - Society of Manufacturing Engineers. MR. SME, Proceedings of the NAMRX XXVI Conference, Atlanta, GA, USA, 98-05-19.

Using single significant factor in due-date assignment rules for dynamic job shops. / Chang, Feng Chang R.; Lyu, Jrjung.

Technical Paper - Society of Manufacturing Engineers. MR. SME, 1998.

研究成果: Chapter

TY - CHAP

T1 - Using single significant factor in due-date assignment rules for dynamic job shops

AU - Chang, Feng Chang R.

AU - Lyu, Jrjung

PY - 1998/12/1

Y1 - 1998/12/1

N2 - Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.

AB - Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.

UR - http://www.scopus.com/inward/record.url?scp=0032313991&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0032313991&partnerID=8YFLogxK

M3 - Chapter

AN - SCOPUS:0032313991

BT - Technical Paper - Society of Manufacturing Engineers. MR

PB - SME

ER -

Chang FCR, Lyu J. Using single significant factor in due-date assignment rules for dynamic job shops. 於 Technical Paper - Society of Manufacturing Engineers. MR. SME. 1998