Using single significant factor in due-date assignment rules for dynamic job shops

Feng Chang R. Chang, Lyu

研究成果: Chapter

摘要

Many studies have shown that the choice of dispatching rule and the choice of due-date assignment rule for dynamic job shops have significant interaction effects on performance and the decisions should be considered collectively. However, most due-date assignment rules are designed to be applied on all production systems regardless of which dispatching rule is used to sequence jobs. This simulation study of a dynamic job shop demonstrates methods of developing due-date assignment rules under various dispatching rules that have achieved statistically significant improvement over the other existing due-date rules in most of the performance measures used.

原文English
主出版物標題Technical Paper - Society of Manufacturing Engineers. MR
發行者SME
出版狀態Published - 1998
事件Proceedings of the NAMRX XXVI Conference - Atlanta, GA, USA
持續時間: 1998 5月 191998 5月 22

Other

OtherProceedings of the NAMRX XXVI Conference
城市Atlanta, GA, USA
期間98-05-1998-05-22

All Science Journal Classification (ASJC) codes

  • 一般工程

引用此