T1 - Using the MD CAD model to develop the time-cost integrated schedule for construction projects
AU - Feng, Chung Wei
AU - Chen, Yi Jao
AU - Huang, Jiun Ru
N1 - Funding Information:
This work was supported by the National Science Council Taiwan under Grant No. NSC 97-2211-E-006-219-MY3 .
PY - 2010/5
Y1 - 2010/5
N2 - Time and cost are two critical factors determining the success of a construction project. However, it is still a daunting task for project planners to develop a time-cost integrated schedule due to the tremendous amount of information that need to be processed. Various research efforts have been made to develop model-based systems to facilitate information processing and integrate time and cost throughout the project life cycle. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project management. This paper presents a scheduling system that applies Multi-Dimensional (MD) CAD model, Object Sequencing Matrix (OSM), and genetic algorithms (GAs) to generate the time-cost integrated schedule for the construction project. A computer implementation called MD CAD model-based Project Scheduling System (MD_PSS) is also developed to verify the feasibility of the proposed approach.
AB - Time and cost are two critical factors determining the success of a construction project. However, it is still a daunting task for project planners to develop a time-cost integrated schedule due to the tremendous amount of information that need to be processed. Various research efforts have been made to develop model-based systems to facilitate information processing and integrate time and cost throughout the project life cycle. However, the results of the previous studies are not comprehensive enough to fulfill the requirements of project management. This paper presents a scheduling system that applies Multi-Dimensional (MD) CAD model, Object Sequencing Matrix (OSM), and genetic algorithms (GAs) to generate the time-cost integrated schedule for the construction project. A computer implementation called MD CAD model-based Project Scheduling System (MD_PSS) is also developed to verify the feasibility of the proposed approach.
UR - http://www.scopus.com/inward/record.url?scp=77949484698&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=77949484698&partnerID=8YFLogxK
U2 - 10.1016/j.autcon.2009.12.009
DO - 10.1016/j.autcon.2009.12.009
M3 - Article
AN - SCOPUS:77949484698
SN - 0926-5805
VL - 19
SP - 347
EP - 356
JO - Automation in construction
JF - Automation in construction
IS - 3
ER -