T1 - Using the MD CAD model to develop the time-cost integrated schedule for construction projects
AU - Feng, Chung Wei
AU - Chen, Yi Jao
N1 - Funding Information:
This work was supported by the National Science Council Taiwan under Grant No. NSC 97-2211-E-006-219-MY3 .
Copyright:
Copyright 2020 Elsevier B.V., All rights reserved.
PY - 2008
Y1 - 2008
N2 - This paper presents a work-item-based scheduling system that employs MD CAD model, Object Sequencing Matrix (OSM), and Genetic Algorithms (GAs) to generate the time-cost integrated schedule for construction projects. Consisting of MD CAD objects, the MD CAD model ensures the consistency and efficiency of information processing and integration in project planning. In the development of MD CAD model-based scheduling system, the Object Sequencing Matrix (OSM) is adopted to formulate a construction sequence of building components based on the physical relationships between MD CAD objects. Genetic algorithms (GAs) are then applied to optimize the sequence of building components and the assignment of crews. As a result, a feasible time-cost integrated project schedule is developed. In computer implementation, the MD CAD model-based Project Scheduling System (MD-PSS) is presented to verify the feasibility of the proposed approach.
AB - This paper presents a work-item-based scheduling system that employs MD CAD model, Object Sequencing Matrix (OSM), and Genetic Algorithms (GAs) to generate the time-cost integrated schedule for construction projects. Consisting of MD CAD objects, the MD CAD model ensures the consistency and efficiency of information processing and integration in project planning. In the development of MD CAD model-based scheduling system, the Object Sequencing Matrix (OSM) is adopted to formulate a construction sequence of building components based on the physical relationships between MD CAD objects. Genetic algorithms (GAs) are then applied to optimize the sequence of building components and the assignment of crews. As a result, a feasible time-cost integrated project schedule is developed. In computer implementation, the MD CAD model-based Project Scheduling System (MD-PSS) is presented to verify the feasibility of the proposed approach.
UR - http://www.scopus.com/inward/record.url?scp=84863009322&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84863009322&partnerID=8YFLogxK
U2 - 10.3846/isarc.20080626.573
DO - 10.3846/isarc.20080626.573
M3 - Conference contribution
AN - SCOPUS:84863009322
SN - 9789955283294
T3 - ISARC 2008 - Proceedings from the 25th International Symposium on Automation and Robotics in Construction
SP - 573
EP - 584
BT - ISARC 2008 - Proceedings from the 25th International Symposium on Automation and Robotics in Construction
PB - Vilnius Gediminas Technical University
T2 - 25th International Symposium on Automation and Robotics in Construction, ISARC 2008
Y2 - 26 June 2008 through 29 June 2008
ER -